Analytics Projects
“The future belongs to the few of us still willing to get our hands dirty”
ESS Feasibility Study
400MW /1,720MWh
Front of the Meter
April 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to address regulated utility needs including PV+S performance modeling, technical diligence, and PPA negotiation support.
ESS Feasibility Study
25MW /178MWh
Front of the Meter
July 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to address regulated utility needs including interconnection studying, PV+S performance modeling, and technical diligence.
ESS Feasibility Study
200MW /1,017MWh
Front of the Meter
May 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to address muni requirements including interconnection studying, PV+S performance modeling, and technical due diligence.
ESS Feasibility Study
288MW /1,518MWh
Front of the Meter
September 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to address offtaker requirements including PV+S performance modeling.
ESS Feasibility Study
4MW /11MWh
Behind the Meter
December 2018
Description
Utility-Scale Behind the Meter Energy Storage System (ESS) project analysis to determine the best ESS size to provide economic demand and peak charge savings at 3 service points of a distribution coop.
ESS Feasibility Study
10MW /12MWh
Front of the Meter
April 2017
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to maximize contracted and uncontracted returns including PV+S performance modeling, market analysis, and co-optimization of different revenue streams.
ESS Feasibility Study
12MW /91MWh
Front of the Meter
June 2017
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to lower offtaker costs including PV+S performance modeling, fully installed sytem initial and ongoing costs, and preliminary design.
ESS Feasibility Study
45MW /230MWh
Front of the Meter
October 2017
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best Energy Storage System (ESS) size to meet CCA needs including PV+S performance modeling, fully installed sytem initial and ongoing costs, and procurement support (RFP development).
ESS Feasibility Study
2MW /5MWh
Behind the Meter
August 2017
Description
Behind the Meter Energy Storage System (ESS) project analysis to determine the best ESS size to maximize end customer savings and provide resiliency including performance modeling of diesel+ESS, fully installed sytem initial and ongoing costs, and preliminary design.
ESS Feasibility Study
4MW /5MWh
Behind the Meter
April 2018
Description
Across the Meter Energy Storage System (ESS) project analysis to determine the best ESS size to maximize returns including performance modeling and co-optimizing behind and front of meter revenues.
ESS Feasibility Study
1MW /3MWh
Behind the Meter
June 2019
Description
Behind the Meter PV+Storage Energy Storage System (ESS) project analysis to determine the best ESS size to maximize end customer savings by retrofitting a DC-coupled ESS to existing PV including PV+S performance modeling, fully installed sytem initial and ongoing costs, and preliminary design.
Preliminary Design
10MW /60MWh
Front of the Meter
July 2019
Description
Preliminary design and RFP submission support for the Energy Storage System (ESS) portion of a Front of the Meter PV+Storage (PV+S) project.
ESS Feasibility Study
20MW /96MWh
Front of the Meter
December 2019
Description
Front of the Meter Energy Storage System (ESS) project analysis to determine the best Energy Storage System (ESS) size to maximize returns including ESS performance modeling, market analysis, and co-optimization of different revenue streams.
M&A Due Diligence
24MW /114MWh
Front of the Meter
June 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to provide due diligence on a fleet of projects including PV+S performance modeling, fully installed sytem initial and ongoing costs, and market analysis.
M&A Due Diligence
8MW /39MWh
Front of the Meter
November 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to provide due diligence on a fleet of projects including PV+S performance modeling, fully installed sytem initial and ongoing costs, and market analysis.
ESS Feasibility Study
80MW /380MWh
Front of the Meter
January 2019
Description
Front of the Meter PV+Storage (PV+S) project analysis to determine the best size of both the PV and Energy Storage System (ESS) including PV+S performance modeling and fully installed sytem initial and ongoing costs.